Click this logo to go directly to the main content - Department of Inspections, Licenses and Permits  
Advanced Searching...
DILP Home
Online Services
About Us...
Plan Reviews...
Fees…
Permits...
Licenses...
Inspections...
Requirements
Request For Inspections
Inspector Phone Directory
Reinspections
Forms & Fees. . .
Permits Issued
FAQ'S
 


COMMERCIAL BUILDING - SLABS

  • Determine if the required base material is four inches thick and consists of clean, graded sand, gravel, crushed stone or crushed slag.
  • Determine if a vapor retarder is provided and that it is a 6 mil visqueen vapor retarder with joints lapped not less than six inches and placed at the bottom of the slab.
  • Determine if the slab thickness and reinforcement is in accordance with design criteria and compares favorably to approved plans.
  • Verify that the concrete mix will result in a compressive strength equal to the design criteria. (Check Delivery Tickets)
  • Verify that required and approved perimeter slab insulation is installed properly.
  • Verify that all requirements to the approved plans have been met.

<< BACK

Howard County Logo