RESIDENTIAL FIRE SYSTEMS
- Ensure that all areas are protected except for small closets and bathrooms under 55 square feet and that:
- A head shall protect the top of all stairs.
- A head shall protect the bottom of all stairs.
- When stairwells are equipped with a door, a head shall be located on the stair side of the door at the top of the stairs.
- Enclosed areas under stairs, used for storage, shall be protected.
- Horizontal beams or other obstructions may require additional heads.
- Heads are at least 24 inches from proposed ceiling fans.
Determine that head spacing is in accordance with the permit documents.
Determine that pipe sizes are in accordance with the permit documents.
Determine that pipe materials are in accordance with the permit documents and that when changing from copper or steel to CPVC that it is done within the heated area.
Determine that approved hangers and bracings are provided at each head and at 6 foot intervals along the pipe.
Determine that insulation and tenting covers all sprinkler piping in the attic and other unheated areas and that:
A minimum of 6 inches thick insulation blanket is used to protect the sprinkler pipes from freezing.
The vapor barrier faces the pipe.
Open truss construction may require boxing or other approved freeze protection system.
Ensure that sprinkler heads are protected from external heat sources and be at least:
6 inches from light fixtures.
18 inches from stoves/ranges.
6 inches from sides of water heater.
24 inches from wall or ceiling heat diffusers.
7 feet from front or side of wood burning stove/fireplace.
5 feet from the front and 18 inches from the side of a gas fireplace.
Check Pressure gauge to ensure that hydro pressure is equal to the static pressure plus 50 psi, and that the gauge is in good working order.
Sprinkler Final Inspection
- Check heads throughout to ensure that:
- They are unobstructed.
- Heads are free of paint, spackle or other debris.
- The escutcheons are in place.
- A minimum 4 inch clearance from walls and corners is maintained.
- All required clearances to electrical and heat producing devices are maintained.
Determine that the water meter is sized and installed in accordance with the permit documents.
Determine that required backflow prevention devices are installed in accordance with the permit documents.
Determine that all valving , including drain valve at gauge, is of approved types and is installed in accordance with the permit documents.
Complete drain and recharge test, system shall be active upon completion.
Draftstop open bays between floor joists to separte improved/unimproved rooms.